• About Us
  • Partnership Opportunities
  • Privacy Policy

Data Center Frontier

Charting the future of data centers and cloud computing.

  • Cloud
    • Hyperscale
  • Colo
    • Site Selection
    • Interconnection
  • Energy
    • Sustainability
  • Cooling
  • Technology
    • Internet of Things
    • AI & Machine Learning
    • Edge Computing
    • Virtual Reality
    • Autonomous Cars
    • 5G Wireless
    • Satellites
  • Design
    • Servers
    • Storage
    • Network
  • Voices
  • Podcast
  • White Papers
  • Resources
    • COVID-19
    • Events
    • Newsletter
    • Companies
    • Data Center 101
  • Jobs
You are here: Home / Hyperscale / Microsoft Plans Azure Cloud Expansions in Iowa, Virginia and Phoenix

Microsoft Plans Azure Cloud Expansions in Iowa, Virginia and Phoenix

By Rich Miller - October 12, 2020 Leave a Comment

Microsoft Plans Azure Cloud Expansions in Iowa, Virginia and Phoenix

A technician works in rows of server racks in a Microsoft Azure cloud data center. (Image: Microsoft)

LinkedinTwitterFacebookSubscribe
Mail

Microsoft continues to expand its global data center infrastructure, buying land to add massive amounts of server capacity in key North American cloud hubs. As it builds more buying Azure Cloud infrastructure, Microsoft is sharpening its focus on sustainability through data center designs that use less water.

In recent weeks Microsoft has bought land in Iowa and Northern Virginia, adding runway for more server capacity in key data center clusters. The land deals total about $50 million, but represents billions of dollars in future investment to build and equip these data centers.

Microsoft also provided new details about its large new data center campus in the Goodyear cloud cluster west of Phoenix, including plans to dramatically reduce the water impact of the huge development.

Iowa Land Deals Signal Future Growth

Microsoft has built a major cloud cluster in West Des Moines, Iowa, where it is developing three large data center campuses. This week, local media revealed that the company has bought land for two additional campuses, which could bring another $2 billion in investment to West Des Moines, atop the estimated $3 billion to $5 billion that Microsoft has spent locally on its campuses.  Iowa

Local real estate transaction data shows that Microsoft has purchased nearly 170 acres of land adjacent to its Project Alluvion data center in West Des Moines, and may be assembling additional land parcels as well. The two new West Des Moines data centers – known as Project Ginger East and Project Ginger West – will each be about 1.8 million square feet and each cost about $1 billion to develop, which includes building construction materials and machinery and equipment, West Des Moines’ community and economic development director Clyde Evans told local media. Construction on the two new data centers is expected to begin in September 2021, Evans said.

Iowa has become a key data center destination for hyperscale operators, as Facebook, Google and Apple also have huge server farms in the state. Placing data centers in the center of the country makes it easier to distribute content to major markets like Chicago and Dallas, reducing lag and buffering for streaming media like Netflix movies or Facebook videos. It also allows for data to move quickly to either coast, which can be important in application development.

This trend is spurring a data center building boom, pumping billions of dollars into towns across America’s heartland.

More Land Banking in Northern Virginia

Northern Virginia is the home of the cloud, with the largest concentration of data center infrastructure anywhere on earth. It’s not surprising that Microsoft continues to secure real estate for future growth in the region.

Over the summer Microsoft bought a 66-acre site in the fast-growing Dulles Cloud Corridor in Northern Virginia. Last week it acquired a 46-acre land parcel in Manassas in Prince William County, which is experiencing major growth as data center builders look beyond Loudoun County and Ashburn’s Data Center Alley, where development sites have grown scarce. The land deal was first reported by the Washington Business Journal, which says Microsoft now controls 440 acres of land in Northern Virginia, and is “believed to be on the hunt for more.”

Microsoft reportedly paid $29 million for 46 acres along Interstate 66, or about $625,000 an acre, compared to the $1.4 million an acre the company paid for its recent land acquisition near Dulles Airport, and the rates approaching $2 million per acre for land in Data Center Alley.

Free Resource from Data Center Frontier White Paper Library

The Cloud is Better at the Edge
This white paper explains how edge computing helps to solve many of the challenges associated with using the cloud for your digital transformation strategy.
We always respect your privacy and we never sell or rent our list to third parties. By downloading this White Paper you are agreeing to our terms of service. You can opt out at any time.

Get this PDF emailed to you.

The future of cloud capacity in Northern Virginia is being shaped by land deals and leasing negotiations that are happening now. As the appetite for data center space remains high, both users and developers are looking to play a longer game.

Building Bigger and Drier in Phoenix Suburbs

Phoenix houses another major concentration of cloud capacity for Microsoft, which operates in multiple leased data centers in Chandler. The company is now building a major data center campus of its own in the western suburbs of Phoenix, where it has bought more than 400 across of land in the emerging cloud hub in Goodyear, and another 150 acres to the north in El Mirage. The campuses will form Microsoft’s West US 3 region, and feature at least 750,000 square feet of data center space in early phases.

Microsoft recently announced plans to make its operations “water positive” by 2030, and outlined a series of initiatives for its Arizona operations to help realize that goal.

“Our datacenter design and operations will contribute to the sustainability of our Arizona facilities,” said Brian Janous General Manager, Energy and Sustainability for Microsoft. “We’re also committed to zero waste-certified operations for this new region, which means a minimum of 90 percent of waste will be diverted away from landfills through reduction, reuse and recycling efforts.

“Microsoft’s Arizona datacenters will use zero water for cooling for more than half the year, leveraging a method called adiabatic cooling, which uses outside air instead of water for cooling when temperatures are below 85 degrees Fahrenheit,” Janous added. “When temperatures are above 85 degrees, an evaporative cooling system is used, which is similar to “swamp coolers” in residential homes. This system is highly efficient, using less electricity and a fraction of water used by other water-based cooling systems, such as cooling towers.”

Microsoft has previously made extensive use of adiabatic cooling systems in its use of factory-built modular data centers or IT-PACs.

LinkedinTwitterFacebookSubscribe
Mail

Tagged With: Goodyear, Iowa, Microsoft, Northern Virginia, Phoenix, Prince William County, Water

Newsletters

Stay informed: Get our weekly updates!

Are you a new reader? Follow Data Center Frontier on Twitter or Facebook.

About Rich Miller

I write about the places where the Internet lives, telling the story of data centers and the people who build them. I founded Data Center Knowledge, the data center industry's leading news site. Now I'm exploring the future of cloud computing at Data Center Frontier.

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Facebook
  • Instagram
  • LinkedIn
  • Pinterest
  • Twitter

Voices of the Industry

Water Scarcity: How Data Centers Can Help

Water Scarcity: How Data Centers Can Help Water scarcity is a looming global crisis. Kris Holla, Group Vice President, Channel Sales, Nortek Air Solutions, and Michael Lesniak, AVP Global Corporate Accounts, Global Data Center Solutions at Nalco Water, discuss how data centers can conserve the planet’s diminishing fresh water supply and practice water stewardship.   

DCF Spotlight

The COVID-19 Crisis and the Data Center Industry

The COVID-19 pandemic presents strategic challenges for the data center and cloud computing sectors. Data Center Frontier provides a one-stop resource for the latest news and analysis for decision-makers navigating this complex new landscape.

An aerial view of major facilities in Data Center Alley in Ashburn, Virginia. (Image: Loudoun County)

Northern Virginia Data Center Market: The Focal Point for Cloud Growth

The Northern Virginia data center market is seeing a surge in supply and an even bigger surge in demand. Data Center Frontier explores trends, stats and future expectations for the No. 1 data center market in the country.

See More Spotlight Features

White Papers

London data center capacity

Bringing Data Center Capacity to a Crowded European City

The wholesale adoption of – and reliance on – electronic payments, the inexorable rise of artificial intelligence (AI), the continuing roll-out and acceptance of the Internet of Things (IoT), and more all means the dataverse is expanding exponentially. Get the new white paper from Echelon Data Centres that explores why now is the right time to expand London data center capacity, in particular, as well as outlines the company’s recent projects in the Docklands.

Get this PDF emailed to you.

We always respect your privacy and we never sell or rent our list to third parties. By downloading this White Paper you are agreeing to our terms of service. You can opt out at any time.

Newsletters

Get the Latest News from Data Center Frontier

Job Listings

RSS Job Openings | Peter Kazella and Associates, Inc

  • AutoCAD Designer - Wayne, NJ
  • Generator Technician - East Rutherford, NJ
  • Data Center QA / QC Manager - Huntsville, AL
  • Data Center QA / QC Technician - Omaha, NE
  • Data Center QA / QC Manager - Phoenix, AZ

See More Jobs

Data Center 101

Data Center 101: Mastering the Basics of the Data Center Industry

Data Center 101: Mastering the Basics of the Data Center Industry

Data Center Frontier, in partnership with Open Spectrum, brings our readers a series that provides an introductory guidebook to the ins and outs of the data center and colocation industry. Think power systems, cooling, solutions, data center contracts and more. The Data Center 101 Special Report series is directed to those new to the industry, or those of our readers who need to brush up on the basics.

  • Data Center Power
  • Data Center Cooling
  • Strategies for Data Center Location
  • Data Center Pricing Negotiating
  • Cloud Computing

See More Data center 101 Topics

About Us

Charting the future of data centers and cloud computing. We write about what’s next for the Internet, and the innovations that will take us there. We tell the story of the digital economy through the data center facilities that power cloud computing and the people who build them. Read more ...
  • Facebook
  • LinkedIn
  • Pinterest
  • Twitter

About Our Founder

Data Center Frontier is edited by Rich Miller, the data center industry’s most experienced journalist. For more than 20 years, Rich has profiled the key role played by data centers in the Internet revolution. Meet the DCF team.

TOPICS

  • 5G Wireless
  • Cloud
  • Colo
  • Connected Cars
  • Cooling
  • Cornerstone
  • Coronavirus
  • Design
  • Edge Computing
  • Energy
  • Executive Roundtable
  • Featured
  • Finance
  • Hyperscale
  • Interconnection
  • Internet of Things
  • Machine Learning
  • Network
  • Podcast
  • Servers
  • Site Selection
  • Social Business
  • Special Reports
  • Storage
  • Sustainability
  • Videos
  • Virtual Reality
  • Voices of the Industry
  • Webinar
  • White Paper

Copyright Data Center Frontier LLC © 2021

X - Close Ad