• About Us
  • Partnership Opportunities
  • Privacy Policy

Data Center Frontier

Charting the future of data centers and cloud computing.

  • Cloud
    • Hyperscale
  • Colo
    • Site Selection
    • Interconnection
  • Energy
    • Sustainability
  • Cooling
  • Technology
    • Internet of Things
    • AI & Machine Learning
    • Edge Computing
    • Virtual Reality
    • Autonomous Cars
    • 5G Wireless
    • Satellites
  • Design
    • Servers
    • Storage
    • Network
  • Voices
  • Podcast
  • White Papers
  • Resources
    • COVID-19
    • Events
    • Newsletter
    • Companies
    • Data Center 101
  • Jobs
You are here: Home / Voices of the Industry / The Advantages of Pre-Engineered Data Center Infrastructure

The Advantages of Pre-Engineered Data Center Infrastructure

By Voices of the Industry - October 4, 2018 Leave a Comment

The Advantages of Pre-Engineered Data Center Infrastructure

In this edition of Voices of the Industry, Steve Clark, Vice President of Data Center Services at Instor Solutions, explores the advantages of pre-engineered data center infrastructure. 

LinkedinTwitterFacebookSubscribe
Mail

In this edition of Voices of the Industry, Steve Clark, Vice President of Data Center Services at Instor Solutions, explores the advantages of pre-engineered data center infrastructure. 

pre-engineered data center infrastructure

Steve Clark, Vice President of Data Center Services at Instor Solutions

There’s the old saying that you can have things either cheap, fast or good, but you can only pick two. This seems to hold true in the data center world as well, meaning the solutions you choose will either be cheap and fast, cheap and good or fast and good, but not all three at once.

It’s the same in data center deployments — quality, timing and cost are all major factors in the design and configuration of data center physical infrastructure, i.e. hot/cold aisle containment, electrical distribution, structured cabling, and cabinets, etc. Most hyperscale players have this down to a science, but many smaller companies who go it alone discover that they’ve grossly underestimated the amount of time it takes to take a data center build from concept to deployment. To understand the mechanics at work here, let’s take a look at the four steps that go into a typical data center deployment.

Understanding What You Have

Step one includes good, old-fashioned legwork. It’s important to first put critical eyes on what’s in place in your data center to determine which hardware is current and operational and which isn’t. Unfortunately, there’s no shortcut here. The more time you put into this (and the next) step, the better output you’ll have at the end.

Understanding What You Need

Next, you need to look at your existing data center structure and balance it against your current and anticipated future needs. Is your data center packed with a multitude of servers that were required for an initiative five years ago, but now just sit there humming and drawing expensive power? Does the existing design of your structured cabling meet the needs of your future operations? If you build based on past needs, you may end up implementing a solution that doesn’t meet your future business objectives.

Designing What You Need

Often, this is where you’ll introduce third-party designers into the mix to determine the electrical, communications, environmental and security requirements for your new data center. It’s crucial to understand the capacity and function of the facility you’re moving into, be it an expansion, a colocation facility or a new build from scratch. Design solutions that integrate fully with that facility while still providing you the functionality you need for your organization. Here, you’ll need to know which vendors and products will work best for you as well as how the build will be physically put together. Creating a conceptual design and fine tuning the eventual solution can often eat up weeks of time. Many companies are now looking at pre-engineered solutions that have emerged in the market, to cut time and increase quality of the end product. A pre-engineered solution not only brings rapid, modular deployment, but is fully compatible with your facility and your requirements, eliminating weeks — and even months in some cases — from the process.

Building What You Need

This is where things can get extra complicated if you don’t have the prior knowledge and experience of multiple deployments under your belt. A build can be a complex process, involving procuring hardware from multiple suppliers, ensuring the material is delivered in the correct order and that you’re coordinating with multiple contractors to work in the same space at the same time. Invariably, this leads to questions from your own business and internal customers, asking “when will that data center be ready?”

What is a Pre-Engineered Solution?

Pre-engineered solutions are those that come fully packaged. All the pieces and parts arrive at virtually the same time, allowing a single contractor to assemble the solution rather than building it, having to fabricate and modify material to fit the design and the physical space. Also, with pre-engineered solutions, site and contractor coordination is minimized.

A pre-engineered solution not only brings rapid, modular deployment, but is fully compatible with your facility and your requirements, eliminating weeks – and even months in some cases – from the process.

One example of a pre-engineered solution could include containment, electrical and structured cabling, but there are many ways to design such solutions. The point is, this sort of solution might cost a little more up front, but it allows you to deploy quickly and effectively, which has a bottom-line effect, as well. In our experience at Instor Solutions, Inc., we’ve found that pre-engineered data center infrastructure solutions can reduce the time to deployment by up to 30 percent.

In short, getting the design and materials right during the early stages of a project directly impacts your ability to deploy quickly. The initial steps of understanding what you have vs. what you want or need can’t be short-cutted, but if a pre-engineered solution is compatible with your requirements, there is a possibility that it can shave weeks off the time required to design, procure and build your datacenter infrastructure – which means you can be serving your organization or customers significantly faster.

Steve Clark is Vice President of Data Center Services at Instor Solutions.  

LinkedinTwitterFacebookSubscribe
Mail

Tagged With: Data Center Design, Data Center Infrastructure, Instor

Newsletters

Stay informed: Get our weekly updates!

Are you a new reader? Follow Data Center Frontier on Twitter or Facebook.
voices@richmiller.biz'

About Voices of the Industry

Our Voice of the Industry feature showcases guest articles on thought leadership from sponsors of Data Center Frontier. For more information, see our Voices of the Industry description and guidelines..

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Facebook
  • Instagram
  • LinkedIn
  • Pinterest
  • Twitter

Voices of the Industry

Reduce Your Water Footprint Cost-Effectively: Three Tips for Data Centers

Reduce Your Water Footprint Cost-Effectively: Three Tips for Data Centers Cem Candir, CEO of Chemstar WATER, provides three tips for data centers looking for cost-effective ways to reduce their water footprint. 

DCF Spotlight

The COVID-19 Crisis and the Data Center Industry

The COVID-19 pandemic presents strategic challenges for the data center and cloud computing sectors. Data Center Frontier provides a one-stop resource for the latest news and analysis for decision-makers navigating this complex new landscape.

An aerial view of major facilities in Data Center Alley in Ashburn, Virginia. (Image: Loudoun County)

Northern Virginia Data Center Market: The Focal Point for Cloud Growth

The Northern Virginia data center market is seeing a surge in supply and an even bigger surge in demand. Data Center Frontier explores trends, stats and future expectations for the No. 1 data center market in the country.

See More Spotlight Features

White Papers

Application of EPA Diesel Tier 4 Final Certified & Compliant Generators

The EPA mandates that all stationary nonemergency generators meet Tier 4 emissions levels. A new white paper from Kohler explains the differences between systems that are compliant through aftertreatment devices, and those that are factory-certified. Get the report to learn more about key considerations and solutions.

Get this PDF emailed to you.

We always respect your privacy and we never sell or rent our list to third parties. By downloading this White Paper you are agreeing to our terms of service. You can opt out at any time.

Newsletters

Get the Latest News from Data Center Frontier

Job Listings

RSS Job Openings | Peter Kazella and Associates, Inc

  • Construction Project Manager - Data Center - Bryan, TX
  • MEP Superintendent - Data Center - Bryan, TX
  • Data Center Facility Manager - San Jose, CA
  • Construction Project Manager - Data Center - Papillion, NE
  • Managing Principal - Data Center Division - Phoenix, AZ

See More Jobs

Data Center 101

Data Center 101: Mastering the Basics of the Data Center Industry

Data Center 101: Mastering the Basics of the Data Center Industry

Data Center Frontier, in partnership with Open Spectrum, brings our readers a series that provides an introductory guidebook to the ins and outs of the data center and colocation industry. Think power systems, cooling, solutions, data center contracts and more. The Data Center 101 Special Report series is directed to those new to the industry, or those of our readers who need to brush up on the basics.

  • Data Center Power
  • Data Center Cooling
  • Strategies for Data Center Location
  • Data Center Pricing Negotiating
  • Cloud Computing

See More Data center 101 Topics

About Us

Charting the future of data centers and cloud computing. We write about what’s next for the Internet, and the innovations that will take us there. We tell the story of the digital economy through the data center facilities that power cloud computing and the people who build them. Read more ...
  • Facebook
  • LinkedIn
  • Pinterest
  • Twitter

About Our Founder

Data Center Frontier is edited by Rich Miller, the data center industry’s most experienced journalist. For more than 20 years, Rich has profiled the key role played by data centers in the Internet revolution. Meet the DCF team.

TOPICS

  • 5G Wireless
  • Cloud
  • Colo
  • Connected Cars
  • Cooling
  • Cornerstone
  • Coronavirus
  • Design
  • Edge Computing
  • Energy
  • Executive Roundtable
  • Featured
  • Finance
  • Hyperscale
  • Interconnection
  • Internet of Things
  • Machine Learning
  • Network
  • Podcast
  • Servers
  • Site Selection
  • Social Business
  • Special Reports
  • Storage
  • Sustainability
  • Videos
  • Virtual Reality
  • Voices of the Industry
  • Webinar
  • White Paper

Copyright Data Center Frontier LLC © 2021

X - Close Ad