• About Us
  • Partnership Opportunities
  • Privacy Policy

Data Center Frontier

Charting the future of data centers and cloud computing.

  • Cloud
    • Hyperscale
  • Colo
    • Site Selection
    • Interconnection
  • Energy
    • Sustainability
  • Cooling
  • Technology
    • Internet of Things
    • AI & Machine Learning
    • Edge Computing
    • Virtual Reality
    • Autonomous Cars
    • 5G Wireless
    • Satellites
  • Design
    • Servers
    • Storage
    • Network
  • Voices
  • Podcast
  • White Papers
  • Resources
    • COVID-19
    • Events
    • Newsletter
    • Companies
    • Data Center 101
  • Jobs
You are here: Home / White Paper / Perfecting Power Quality Management in Today’s Data Centers

Perfecting Power Quality Management in Today’s Data Centers

By Julius Neudorfer - November 25, 2020 Leave a Comment

Perfecting Power Quality Management in Today’s Data Centers

A battery room inside the QTS Data Centers campus in Richmond, Va. These batteries provide temporary emergency power for UPS systems. (Photo: Rich Miller)

LinkedinTwitterFacebookSubscribe
Mail

This entry in a special report series walks readers through a variety of different elements of power quality management (PQM) for today’s data centers, including ground leakage currents, energy efficiency, the evolution of UPS systems, PDU transformers and more. 

power quality management

Get the full report.

IT Equipment Ground Leakage Currents

While most ITE PS meet safety approvals, they do generate a small amount of leakage currents into the chassis ground. The current are relatively small, ranging from less than a milliamp up to xx milliamps, from each ITE PS, depending on the PS. However, in a data center with hundreds or thousands of ITE PS the combined ground current can add up to several amps for a typical 200-300 KVA floor level PDU. This is safe as long as the power distribution system is properly grounded. Most large data center floor level PDUs measure ground conductor current, but unless it reaches an alarm set point, it goes unnoticed. Moreover, these ground currents often contain harmonics, which when combined may become significant in the output side neutral leg of a 208/120 volt 3-phase Wye system, where the neutral may be bonded to ground at the PDU.

PUE and the Quest for Energy Efficiency

The Green Grid introduced Power Usage Effectiveness (PUE) in 2007 and since then the quest for data center energy efficiency has influenced many areas of the data center infrastructure. This includes the increase use of variable frequency drives for cooling systems.

If the UPS software detects a problem with the input power, it transfers the load back to the inverter.

Energy Efficient UPS

This has also driven UPS manufacturers to improve the mainstay of the conditioned power; the classic double-conversion online UPS. While there have been many clear improvements in the last decade in the efficiency of the double-conversion electronics (moving the average from the mid-80% range to the low-90% under low loads), another efficiency scheme was developed; the so-called “energy saver” or “eco-mode”. To reduce double-conversion losses, this “eco-mode” of operation monitors the quality of the power input to the UPS and if it is deemed satisfactory, automatically puts the UPS into static bypass of the inverter condition, via the internal static bypass switch (solid state), which routes utility power directly to the ITE Load. If the UPS software detects a problem with the input power, it transfers the load back to the inverter. UPS vendors claim this is safe, since the transfer occurs within 4-8 milliseconds (which is within the CEBMA curve). While this may be true, only a PQ meter with an event recorder could monitor, verify and document if there are any issues.

PDU Transformers

In the U.S., for most midsize and larger data centers the UPS is typically a 480V system and the voltage to the ITE is stepped down to 208/120 volts at a floor level PDU with an internal transformer. The type and rating (k-factor) of transformer will determine how well it can handle harmonics generated by load, which are primarily ITE switched-mode power supplies (which as noted earlier, have a harmonic currents and a power factor which can vary with load). The higher the k-factor rating specified in the PDU (typically K1, K4, k13, andK20) the better in can tolerate the harmonic content of the load.

However, the cost of the transformer increases with the k-factor and in some cases a lowest k-factor transformer (K-1) was used because the k-factor was not specified in a price based bid, or for other financial reasons. As a result, the transformer will heat-up (or overheat) as well as saturate, introducing waveform distortion, and therefore is a good candidate for PQ metering.

Grounding Issues

Grounding practices in data centers are a complex and often misunderstood issue. There are many basic electrical code life-safety specifications and requirements for bonding and grounding the electrical system for any building. Data centers have numerous special requirements since data networks and ITE can be impacted by noise. There are many technical whitepapers as well as IEEE and TIA specifications that addresses and differentiates data center and telecommunications system signal grounding from basic life-safety electrical grounding requirements. Standard practice is to have a separate single point telecomm grounding system which only connects with the main electrical ground at a single point.

Sometimes issues occur during initial construction when power distribution equipment in the data center is incorrectly grounded to building steel or if the neutral conductor is incorrectly bonded to ground in multiple places. This can also occur when new equipment is added to the power distribution system. These conditions can go undetected unless an extensive electrical survey is done which examines and measures the ground and neutral currents and voltage differentials. PQMs which can measure and record these ground and neutral data, as well as capture any harmonics can help identify and diagnose problems caused by these issues.

Next week,  this special report series will further explore data center infrastructure monitoring and more. Catch up the first entry, and second entry in the series, as well.

Download the full report, “Understanding the Importance of Power Quality in the Data Center,” to explore the importance of power quality management in the data center.

LinkedinTwitterFacebookSubscribe
Mail

Tagged With: Data Center Power, powerside, special report

Newsletters

Stay informed: Get our weekly updates!

Are you a new reader? Follow Data Center Frontier on Twitter or Facebook.

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Facebook
  • Instagram
  • LinkedIn
  • Pinterest
  • Twitter

Voices of the Industry

Water Scarcity: How Data Centers Can Help

Water Scarcity: How Data Centers Can Help Water scarcity is a looming global crisis. Kris Holla, Group Vice President, Channel Sales, Nortek Air Solutions, and Michael Lesniak, AVP Global Corporate Accounts, Global Data Center Solutions at Nalco Water, discuss how data centers can conserve the planet’s diminishing fresh water supply and practice water stewardship.   

DCF Spotlight

The COVID-19 Crisis and the Data Center Industry

The COVID-19 pandemic presents strategic challenges for the data center and cloud computing sectors. Data Center Frontier provides a one-stop resource for the latest news and analysis for decision-makers navigating this complex new landscape.

An aerial view of major facilities in Data Center Alley in Ashburn, Virginia. (Image: Loudoun County)

Northern Virginia Data Center Market: The Focal Point for Cloud Growth

The Northern Virginia data center market is seeing a surge in supply and an even bigger surge in demand. Data Center Frontier explores trends, stats and future expectations for the No. 1 data center market in the country.

See More Spotlight Features

White Papers

colocation services

Integrating Colocation Services with Business Operations

A&M helps companies around the world address complex business issues to boost their productivity and performance. Get the new white paper from QTS that explores how Alvarez & Marsal (A&M) has benefited from integrating colocation services with business operations.   

Get this PDF emailed to you.

We always respect your privacy and we never sell or rent our list to third parties. By downloading this White Paper you are agreeing to our terms of service. You can opt out at any time.

Newsletters

Get the Latest News from Data Center Frontier

Job Listings

RSS Job Openings | Peter Kazella and Associates, Inc

  • AutoCAD Designer - Wayne, NJ
  • Generator Technician - East Rutherford, NJ
  • Data Center QA / QC Manager - Huntsville, AL
  • Data Center QA / QC Technician - Omaha, NE
  • Data Center QA / QC Manager - Phoenix, AZ

See More Jobs

Data Center 101

Data Center 101: Mastering the Basics of the Data Center Industry

Data Center 101: Mastering the Basics of the Data Center Industry

Data Center Frontier, in partnership with Open Spectrum, brings our readers a series that provides an introductory guidebook to the ins and outs of the data center and colocation industry. Think power systems, cooling, solutions, data center contracts and more. The Data Center 101 Special Report series is directed to those new to the industry, or those of our readers who need to brush up on the basics.

  • Data Center Power
  • Data Center Cooling
  • Strategies for Data Center Location
  • Data Center Pricing Negotiating
  • Cloud Computing

See More Data center 101 Topics

About Us

Charting the future of data centers and cloud computing. We write about what’s next for the Internet, and the innovations that will take us there. We tell the story of the digital economy through the data center facilities that power cloud computing and the people who build them. Read more ...
  • Facebook
  • LinkedIn
  • Pinterest
  • Twitter

About Our Founder

Data Center Frontier is edited by Rich Miller, the data center industry’s most experienced journalist. For more than 20 years, Rich has profiled the key role played by data centers in the Internet revolution. Meet the DCF team.

TOPICS

  • 5G Wireless
  • Cloud
  • Colo
  • Connected Cars
  • Cooling
  • Cornerstone
  • Coronavirus
  • Design
  • Edge Computing
  • Energy
  • Executive Roundtable
  • Featured
  • Finance
  • Hyperscale
  • Interconnection
  • Internet of Things
  • Machine Learning
  • Network
  • Podcast
  • Servers
  • Site Selection
  • Social Business
  • Special Reports
  • Storage
  • Sustainability
  • Videos
  • Virtual Reality
  • Voices of the Industry
  • Webinar
  • White Paper

Copyright Data Center Frontier LLC © 2021

X - Close Ad